Develop by pinakincode@gmail.com

CASE STUDY

1. St. Georges Shopping Centre Service Deck

6

St. Georges Shopping Centre roof service deck H2o Seal Ltd has been appointed to refurbish the top deck of the St Georges Shopping centre service deck. St. George’s Shopping Centre Conveniently situated in the heart of Gravesend here to serve our local community. For those essentials in life, you will find a large choice of popular high street names including Boots, WHSmith, Argos and many more, in addition to a large selection of unique independent stores covering everything from fashion to flowers and silver jewellery to sweets. The refurbishment works 3800m2 , which include applying one of Degafloor external systems, are unusually challenging as they will follow a complex hased programme ensuring the service deck  stays open and operational throughout, with minimal disruption to staff,  and visitors.

2. REFURB OF MASTIC WEARING SURFACE AT AXA Case

7

Project Specifics The mastic asphalt wearing surface at the AXA, Basingstoke car park had reached the end of its serviceable life, with numerous cracks, splits and blisters throughout. These surface defects, a common phenomenon with ageing asphalt wearing surfaces, allow water and salts to percolate through the structure. Not only does this eventually cause damage to the reinforced concrete structure, but dripping salts will inevitably stain vehicle paintwork. H2O Seal Ltd were appointed to deliver the refurbishment  which included the application of the Triflex DFS external system to the asphalt surfaced top deck, plus some concrete and joint repairs. H2O Seal Ltd were onsite within two weeks, which enabled AXA to make use of the quieter summer months when the car park use was at its lowest.

3. Crystal Peaks, Sheffield

8

The waterproofing of the Crystal Peaks shopping centre service deck began following an Electronic Leak Detection survey to the mastic asphalt deck to determine the extent and location of leaks. The existing wearing surface was able to be retained avoiding major disruption. Following preparation works a liquid applied resin was installed to provide a waterproof barrier.   Protection of the membrane was provided by a new wearing surface, much of which was installed out of hours. line markings and pedestrian walkways were also upgraded, with drainage and threshold alterations carried out to accommodate the changes in service deck height.

4. Sainsburys Superstore in Walthamstow, London

9Working in partnership with Cemplas Ltd, commissioned to refurbish top deck  car park. Car Park remained open throughout the duration. Over 6000sqm of Tremco Pu deck coatings were installed.

5. Hart Shopping Centre, Fleet

10

H2o Seal Ltd  has been appointed to refurbish  entrance & exit ramps to Multi Park.